# FTM Sites

Front-of-the-meter sites that trade against a generation plan — the daily plan cycle, market prices, and the tabs behind each site.

*Monitoring & Control → FTM Sites*

**Availability:** FTM Sites appears only for tenants with the front-of-the-meter module enabled. If you do not see it in the menu, your organisation does not have it.

## What an FTM site is

A front-of-the-meter site sells into a market rather than to a site load. That changes the daily rhythm: for every trading day someone must submit a **generation plan** before gate closure, the site must follow it, and the difference between plan and delivery has a financial consequence.

This page is built around that cycle rather than around performance monitoring.

## The site list

-   **Site Name**.
-   **PV to Grid**, **PV to Storage**, **Storage to Grid**, **Grid to Storage** — the four energy flows for the period, which describe what the site actually did.
-   **Days with Prepared Plans** — how far ahead the site is covered. This is the column to watch: a site at zero has nothing submitted for tomorrow.
-   **Plan Received** and **Plan Set** — ticks or crosses for the two halves of the cycle: a plan arrived, and a plan was pushed to the site.
-   **Availability** — the site's availability for the period.
-   **Weather**, **SMP**, **SCADA** — traffic lights for the three feeds the cycle depends on: weather forecast, market prices and the site's own control link. A red light explains a missing plan faster than anything else on the page.

Search and the period control work as elsewhere.

![The FTM Sites list with plan, availability and data-source columns](https://cdn-assets.productfruits.com/cc6bf72d-e01d-4a51-8f30-ce3d2afbf61d)

## Inside a site

Clicking a site opens a workspace with ten tabs: **Dashboard**, **PV System**, **Storage**, **Policies**, **Insights**, **Maintenance**, **Documents**, **Cash Flow**, **Operations Control** and **Diagnostics**.

### Dashboard

Three cards across the top:

-   **Generation Plan** — the planned *PV*, *PV To Export*, *Grid To Storage* and *Storage To Grid* for the day.
-   **SMP** — system marginal price from the market operator (NOGA in Israel), with *Peak* and *Off-Peak* prices and the day's price curve. This is the input that decides when it is worth exporting.
-   **Weather** — temperature and irradiance, the basis of the production forecast the plan is built on.

Below, the plan itself in **Graph View** or **Table View**, with a selector between the editable **Generation Plan** and the read-only **Loading Plan**. When a day has nothing yet the page says so plainly — *No Generation Plan Found. Try to import a plan or copy a plan from another date* — and **Copy other plan to here** is the quickest fix for a typical day.

The right rail carries the operational state: a countdown in days, hours and minutes to the next submission deadline, **Update Site** to push the plan, import and export buttons for plan files, **Days with prepared plans**, an **Audit** trail of changes, an **Open Alerts** donut split High / Medium / Low with repetitive alerts called out, and **Availability**.

### PV System

The generation view: a summary line with energy, revenue, meter energy and normalised versus expected; a **System / Inverters / Meters** selector; metric chips including AC Power, Meter Power, PPC and POA Irradiance at 15-minute granularity; and a **Benchmark** with a radius slider that compares the site against others within a chosen distance. The **Energy Losses** waterfall appears once the day is complete — it is generated only after all daily data is received.

### Storage

The same layout as a battery's analysis page — capacity, energy imported and exported with costs, profit, RTE and availability, plus the live-data rail — with a **SEND** action for sharing.

### Operations Control

The controllable devices at the site, listed as **Name**, **Vendor**, **SN**, **Mode** and **Status**, with **+** to add one. *Mode* is what each device is currently doing under control.

### The remaining tabs

**Policies**, **Insights**, **Maintenance** and **Documents** behave as they do elsewhere in the portal. **Cash Flow** holds the financial result of the site's trading, and **Diagnostics** the device-level checks.

## Common tasks

**Daily plan check.** Sort the list by *Days with Prepared Plans* ascending and work through anything at zero before gate closure. Check the Weather, SMP and SCADA lights on the same row.

**Build tomorrow's plan quickly.** Open the site → Dashboard → *Copy other plan to here* from a comparable day, adjust in Table View, then *Update Site*.

**Explain a deviation.** Compare the plan with the PV System tab's actuals for the same day, and read the Energy Losses waterfall once the day is closed.

**Check who changed what.** The Audit panel on the Dashboard rail.

## Common questions

**The plan was not submitted.**  
Check the countdown (was it past gate closure), the SCADA light (could the site be reached) and the Audit panel (was a plan ever set).

**SMP shows no prices.**  
The market feed is unavailable — the SMP traffic light on the list will be red. Plans can still be built, but not optimised against price.

**Why is the Energy Losses waterfall empty?**  
It is produced only after the day completes and all data has arrived.