Actual vs. Expected: vs. expected and from expected

Actual vs. Expected tells you how your production compares to the plan. This setting picks how that number is written: as the gap to the plan (vs. expected) or as the share of the plan you have produced (from expected). It is one choice for the whole account, so every user sees the same number.

Where to set it

Go to Global Settings β†’ Performance and find the Production vs. targets card. Pick a Method, then click Update.

Production vs. targets card in Global Settings, Performance, with Method set to vs. expected (Default)

Method dropdown open with the two options: vs. expected (Default) and from expected

Method

What it shows

On plan reads

vs. expected (default)

How far above or below the plan so far you are. 40 kWh produced against 50 kWh planned reads 20% with a red down arrow.

0%

from expected

How much of the plan so far you have produced. 40 kWh against 50 kWh planned reads 80%.

100%

Hover the β“˜ next to Method to see the same example on screen.

Method info tooltip: day 15 of 30, plan so far 50 kWh, produced 40 kWh. vs. expected reads -20%, from expected reads 80%

How it is calculated

Both methods compare to the plan up to today, not the plan for the whole period. On day 15 of a 30-day month, you are measured against the first 15 days of expected production. Once a period has ended, the plan so far is the whole period.

  • vs. expected = (Actual βˆ’ Expected so far) Γ· Expected so far
  • from expected = Actual Γ· Expected so far

Worked example

A 30-day month with 300 kWh planned, so 10 kWh a day.

Day

Planned so far

Produced so far

vs. expected

from expected

Day 5

50 kWh

40 kWh

20% below

80%

Day 15

150 kWh

150 kWh

0% (on plan)

100%

Day 25

250 kWh

275 kWh

10% above

110%

Day 30 (end)

300 kWh

294 kWh

2% below

98%

Colours

Method

Green

Red

vs. expected

On or above the plan so far

Below the plan so far, with a down arrow

from expected

Any period still in progress. A closed day, month or year at 100% or more.

A closed day, month or year below 100%.

With from expected, a period that is still running stays green. It turns red only once the period is over and you finished below the plan.

Where you see it

Every place that shows Actual vs. Expected follows the account setting, including:

  • Fleet Management β†’ PV Sites: the Actual vs. Expected card in the summary bar (click Show summary) and the Actual vs. Expected column
  • The Dashboard systems table: the Actual vs. Expected column
  • A system's page: the Actual vs. Expected difference tooltip

The line under the card title names the targets it covers: Expected, P50 and WA (weather-adjusted expected).

How to

  1. Report performance as "percent of plan done". Set Method to from expected and click Update. An on-plan fleet now reads 100% at any point in the month.
  2. Go back to the gap view. Set Method to vs. expected and click Update. Nothing else changes.
  3. Check a number by hand. Take Actual and Expected for the days so far in the period, then apply the formula for your method above.

Notes

  • The default is vs. expected. Accounts that never change it see the same numbers as before.
  • It applies to everyone in the account. There is no per-user or per-system choice.
  • No plan yet shows N/A, never 0%. This happens at the very start of a period, or when a system has no expected production.
  • Meter vs. inverter is not affected. It compares two readings of the same energy, so it always shows the gap.
  • Only users who can edit Global Settings can change the method.