Actual vs. Expected: vs. expected and from expected
Actual vs. Expected tells you how your production compares to the plan. This setting picks how that number is written: as the gap to the plan (vs. expected) or as the share of the plan you have produced (from expected). It is one choice for the whole account, so every user sees the same number.
Where to set it
Go to Global Settings β Performance and find the Production vs. targets card. Pick a Method, then click Update.
Method | What it shows | On plan reads |
|---|---|---|
vs. expected (default) | How far above or below the plan so far you are. 40 kWh produced against 50 kWh planned reads 20% with a red down arrow. | 0% |
from expected | How much of the plan so far you have produced. 40 kWh against 50 kWh planned reads 80%. | 100% |
Hover the β next to Method to see the same example on screen.
How it is calculated
Both methods compare to the plan up to today, not the plan for the whole period. On day 15 of a 30-day month, you are measured against the first 15 days of expected production. Once a period has ended, the plan so far is the whole period.
- vs. expected = (Actual β Expected so far) Γ· Expected so far
- from expected = Actual Γ· Expected so far
Worked example
A 30-day month with 300 kWh planned, so 10 kWh a day.
Day | Planned so far | Produced so far | vs. expected | from expected |
|---|---|---|---|---|
Day 5 | 50 kWh | 40 kWh | 20% below | 80% |
Day 15 | 150 kWh | 150 kWh | 0% (on plan) | 100% |
Day 25 | 250 kWh | 275 kWh | 10% above | 110% |
Day 30 (end) | 300 kWh | 294 kWh | 2% below | 98% |
Colours
Method | Green | Red |
|---|---|---|
vs. expected | On or above the plan so far | Below the plan so far, with a down arrow |
from expected | Any period still in progress. A closed day, month or year at 100% or more. | A closed day, month or year below 100%. |
With from expected, a period that is still running stays green. It turns red only once the period is over and you finished below the plan.
Where you see it
Every place that shows Actual vs. Expected follows the account setting, including:
- Fleet Management β PV Sites: the Actual vs. Expected card in the summary bar (click Show summary) and the Actual vs. Expected column
- The Dashboard systems table: the Actual vs. Expected column
- A system's page: the Actual vs. Expected difference tooltip
The line under the card title names the targets it covers: Expected, P50 and WA (weather-adjusted expected).
How to
- Report performance as "percent of plan done". Set Method to from expected and click Update. An on-plan fleet now reads 100% at any point in the month.
- Go back to the gap view. Set Method to vs. expected and click Update. Nothing else changes.
- Check a number by hand. Take Actual and Expected for the days so far in the period, then apply the formula for your method above.
Notes
- The default is vs. expected. Accounts that never change it see the same numbers as before.
- It applies to everyone in the account. There is no per-user or per-system choice.
- No plan yet shows N/A, never 0%. This happens at the very start of a period, or when a system has no expected production.
- Meter vs. inverter is not affected. It compares two readings of the same energy, so it always shows the gap.
- Only users who can edit Global Settings can change the method.